(TSS) etc.The overall performance efficiency of 100 MLD Sewage treatment plant will be evaluated by collecting samples for the period of 10 months (March to December).The results of these evaluations also determine whether the effluent discharged into the water body are under limits given by M...
tender for request for proposal for works and operation service for design build and operation with up gradation of existing 240mld sewage treatment plant and allied infrastructure including one terminal sewage pump station with operation and maintenance
Performance evaluation of 5 MLD Sewage Treatment Plant (STP) at IDL Lake, HyderabadSravan Kumar Kota
tender for request for proposal for works and operation service for design build and operation of new 375mld sewage treatment plant and up gradation of the allied infrastructure including three terminal sewage pump stations with operation and maintenance