Presents articles on mines and mineral resources in the United States. Exception process in the prices of petroleum products; Provisions on oil properties under an internal revenue law; Assessment on the decision of the Supreme Court rel...
Nowadays, the copper has become the second strategic raw material in China, which is next only to petroleum (Wang, 2014; Yin, 2003). Over 90% of modern industrial enterprises need copper products, and copper has already become a significant strategic resource with regard to national safety for...
The Historical Resource and Reserve Estimates were reported in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards on Mineral Resources and Mineral Reserves adopted by CIM (2014 edition) (the "CIM Standards"). No...
Metallurgy and Petroleum (CIM) Definition Standards on Mineral Resources and Mineral Reserves adopted by CIM (2014 edition) (the "CIM Standards"). No statement was provided as to whether the Cerro del Gallo reserve and resource estimates were prepared using the CIM Estimation ...
The mining right was issued for an initial period of 30 years and may be renewed for further periods, each of which may not exceed 30 years at a time, in accordance with the terms of section 24 of the Mineral and Petroleum Resources Development Act. 6. Joint operations The Company has ...
- 石油工程(Petroleum Engineering) 自然科学(物理、化学、天文、地理)(Physical Sciences) - 水文学和水利科学(Hydrology and Water Resources Science) - 物理,概述(Physics, General) - 地理与地震学(Geophysics and Seismology) - 物理,其他(Physics, Other) ...
Mechanical Engineering, Computer Science, Chemical Engineering, Electrical and Electronics Engineering, Petroleum Engineering, Civil Engineering, General, Geological/Geophysical Engineering, Metallurgical Engineering, Computational and Applied Mathematics, Engineering Physics/Applied Physics ...
The mining right was issued for an initial period of 30 years and may be renewed for further periods, each of which may not exceed 30 years at a time, in accordance with the terms of section 24 of the Mineral and Petroleum Resources Development Act. Itochu, together with other Japanese-...
The Phoenix FS and Gryphon Update have been completed in accordance with NI 43-101, Canadian Institute of Mining, Metallurgy and Petroleum (CIM) standards, and best practices, as well as other standards such as the AACE Cost Estimation Standards. Other than as discussed herein and the risks ...
The mining right was issued for an initial period of 30 years and may be renewed for further periods, each of which may not exceed 30 years at a time, in accordance with the terms of section 24 of the Mineral and Petroleum Resources Development Act. Itochu Corporation, together with other...