location can be adjusted based on the actual situation. • Two power modules need to be installed for a 24-port LAN switch onsite.15.4 (Optional) Installing the IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take off the chass...
There are 3 big die spotting machines that can assemble big moulds instead of the labor force,so that we can get high-quality mould and save time.We have equipped our machines on a product-specific basis with the latest detecting systems, each mould shall bein spect...
Then, clicking on the Save button to backup the configuration rom file to a proper location. 1. Connect to the console port and open the Terminal Emulation Software. 2. Restarting the Switch to enter the debug mode via the terminal. 3. Enter "ATTD" All contents copyright (c) 2006 ZyXEL...
location can be adjusted based on the actual situation. • Two power modules need to be installed for a 24-port LAN switch onsite.15.4 (Optional) Installing the IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take off the chass...
location can be adjusted based on the actual situation. • Two power modules need to be installed for a 24-port LAN switch onsite.15.4 (Optional) Installing the IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take off the chass...
location can be adjusted based on the actual situation. • Two power modules need to be installed for a 24-port LAN switch onsite.15.4 (Optional) Installing the IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take off the chass...
location can be adjusted based on the actual situation. • Two power modules need to be installed for a 24-port LAN switch onsite.15.4 (Optional) Installing the IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take...