ait's broken 它打破了[translate] a作为消费者 As consumer[translate] a光通路诊断面板 Light circuit diagnosis kneading board[translate] aThe means and methods of construction shall be as the Contractor may 建筑手段和方法将是,承包商可以[translate]...
Numerous published guides on general conditions in contract documents clearly stipulate that the contractor is solely responsible for the means and methods of construction. The benefits of this truism are numerous and justified in the context of traditional infrastructure projects. In the realm of the ...
of structure desired. Enormous changes in materials and techniques of construction within the last few generations have made it possible to enclose space with much greater ease and speed and with a minimum of material. Progress in this area can be measured by the difference in weight between ...
Dec. 31. Moulding tyres.-Covers for the pneumatic tyres of motor vehicles are made on an annular metal mould of the section shown in Figs. 2 and 4. Layers c<2>, c<3> of prepared canvas and rubber pieces c' forming beadings are bound upon the mould by canvas strips c<4>, and ...
This invention relates to methods of and means for assembling match-books and similar articles in series, and has for its main object the provision of a simple and efficient arrangement for placing such articles in sequence with alternate articles in reversed position endwise but without reversing....
a method of modular construction for building structural wall panels is of laminated construction (18) made of sheet metal (19), (20) and foam insulation sheet of fibrous cement (or structural plywood panels (21) attached to a ssemblage floors (10) by means of fixing legs (24).the longi...
research as a means of negating the alarming onset of the post-truth society. Research is required that looks beyond the imperatives of narrowly def i ned productivity. It is essential that policy narratives such as MMC are fully explored in terms of their short-, medium- and long-term ...
The 6 Lean Construction Principles Barriers To Lean Construction Conclusion It is no secret that construction productivity and efficiency have decreased over the years. In the 1970s, the construction industry was one of the most productive sectors in the US. But the situation has changed dramatically...
The results from different PCA experiments show that the actual dimensionality of the sets lies between 4 and 6. This means that all indicators are strongly correlated to 4 to 6 components. Indeed, more than 90% of the total variance is driven by these 4–6 components, regardless of the LC...