and the Topside modules of several FPSO projects. CIMC Raffles is currently undertaking the P80 and P83 FPSO hull construction contract. Moreover, in the field of conversion projects, in addition to the delivery of the Mero 3 FPSO, CIMC Raffles has also undertaken an order for the conversion...
Petrobras, operator of the Mero field (38.6%), has earlier in Januaryawarded a contract worth over $1 billion to TechnipFMC, covering engineering, procurement, construction, and installation (iEPCI) of the HISEP at Marechal Duque de Caxias FPSO (Mero 3 project), which is currently under const...
The Mero 1 development has proved to be a success with the achievement of the highest oil production flowrate per FPSO (250,8 kboepd)in Brazil in early 2023. Its subsea architecture has been considered and applied not only for the next Mero Projects, but also for future Petrobras Pre-Salt...
Petrobras entered a contract with SBM for the lease and operation of the second platform, FPSO Sepetiba, in December 2019. In the same month, SBM formed a joint venture (JV) with Mitsubishi and Nippon Yusen Kabushiki Kaisha for the charter, operation and maintenance of FPSO Sepetiba. SBM was...
近日,“Mero 3 FPSO 项目命名暨交付仪式”在中集来福士烟台基地举行,这是国内首例集主船体改造、全部模块建造及集成、FPSO系统调试等工作于同一船厂完成的FPSO修改造项目。该项目由中集来福士承接,交付给船东马来西亚国际航运公司(MISC),之后将为巴西国家石油公司提供服务,安装在里约热内卢海上Libra区块的Mero油田,用于巴西...