The Zilwaukee Bridge is a eight-lane structure that was constructed to replace a four-lane drawbridge at the same location built in 1960. The original bridge caused major backups on I-75 with frequent openings for ship traffic going from Saginaw, MI to the Great Lakes. The Zilwaukee Bridge...
MDOT Traffic and Safety will provide direction as to what will be required as part of this project. The consultant team will be responsible for all the work required to prepare the plans and special provisions. 16. Perform a Crash Analysis and Safety Review for this project. (See A...