Calorie HNT is considered as one of the foremost & growing engineering and systems integration company, lump-sum turnkey (LSTK) contractor, focused on delivering complete solutions in the field of various diversified field of activities in industrial, in
[translate] a通过托福考试 Through TOEFL[translate] a太无聊了, 就每天呆在宿舍, 不知道要做啥 正在翻译,请等待... [translate] aby the In-Kingdom Lump-Sum Turnkey (LSTK) CONTRACTOR. 由在王国总金额管理监牢者(LSTK)承包商。[translate]
avibration envelope 振动信封[translate] aengineered, procured and constructed during the Detailed-Design phase by the In-Kingdom Lump-Sum Turnkey (LSTK) CONTRACTOR. 设计,获得和修建在期间由在王国总金额管理监牢者(LSTK)承包商详细设计阶段。[translate]...
求翻译:Hence, LSTK CONTRACTOR shall base his bid on the plot area as per details provided by his selected vendor. It is anticipated that some vendors may require larger plot area. However, due to plot area limitations, vendors to be advised to minimize the required plot area. LSTK CONTRACTOR...
While providing an acceptable quality, a construction contractor working on the basis on LSTK project is expected to work within limited time and budget. The objectives of this paper are to identify and assess the criticality level of the success factors of construction projects. The authors ...
by the In-Kingdom Lump-Sum Turnkey (LSTK) CONTRACTOR.问题补充:匿名 2013-05-23 12:21:38 在英国总价交钥匙(LSTK)承包商。 匿名 2013-05-23 12:23:18 由in-kingdom lump-sum统包(lstk)承包商。 匿名 2013-05-23 12:24:58 由在王国总金额管理监牢者(LSTK)承包商。 匿名 2013-05-23...
a他被任命为这家公司出口部经理 He is appointed leaves for this company oral area manager [translate] aTie-in package developed during project proposal shall be review and revalidate by LSTK CONTRACTOR. 搭卖包裹开发了在项目申请期间是回顾和revalidate将由LSTK承包商。 [translate] ...
aCONTRACTOR shall assure that the tie-in schedule is finalized and approved by The Owner during the early stages of detailed design. Tie-in package developed during project proposal shall be review and revalidate by LSTK CONTRACTOR. 承包商保证搭卖日程表由所有者完成并且批准在详细设计期间早期。 在...
a5.2.2.2.11 Note that Power System Automation (PSA) for the new 4.16kV controlgear is not included in this project proposal and shall be engineered, procured and constructed during the Detailed-Design phase by the In-Kingdom Lump-Sum Turnkey (LSTK) CONTRACTOR. 5.2.2.2动力系统自动化的.11笔记...
LSTK CONTRACTOR is solely responsible for any requ 因此, LSTK承包商将根据他的出价剧情区域根据他选择的供营商提供的细节。 它被期望有些供营商也许需要更大的剧情区域。 然而,由于剧情区域局限,供营商将被劝告使必需的剧情区域减到最小。 LSTK承包商负责单一地对对指定的初阶分配的FGRS滑行被密谋的地区维度...