| | | LS-DYNA, A Program for Nonlinear Dynamic | | Analysis of Structures in Three Dimensions | | Date : 10/29/2021 Time: 15:50:06 | | Version : smp d R12 | | Revision: R12.1-190-gadfcdf9018 | | | | Features enabled in this version: | | Shared Memory Parallel ...
initialization completed dt of cycle 1 is controlled by shell element 31 time... 0.00000E+00 time step... 2.78623E-05 kinetic energy... 1.00000E+03 internal energy... 1.00000E-20 spring and damper energy... 1.00000E-20 system damping energy... 0.00000E+00 sliding interface energy... 0....
total number of massless nodes = 14 The LS-DYNA time step size should not exceed 3.112E-04 to avoid contact instabilities. If the step size is bigger then scale the penalty of the offending surface. *** Error 30006 (INI+6) initialization completed with 2 or more fatal errors please check...
• Plastic strain and thickness initialization is added to the draw bead contact option. See *CONTACT_DRAWBEAD_INITIALIZE. • Tied contact with offsets based on both constraint equations and beam elements for solid elements and shell elements that have 3 and 6 degrees-of-freedom per node, ...
initializationcompleteddtofcycle1iscontrolledbyshellelement31 time. 0.00000E+00 timestep...2.78623E-05 kineticenergy. 1.00000E+03 internalenergy...1.00000E-20 springanddamperenergy... 1.00000E-20 systemdampingenergy... 0.00000E+00 slidinginterfaceenergy... 0.00000E+00 externalwork... 0.00000E+00 ...
0不行,后来改成14.5和16.2就都可以了。建议楼主换个ansys版本试试 发自小木虫Android客户端 ...
initialization completed forrtl: severe (170): Program Exception - stack overflow Image PC Routine Line Source lsdyna_dp.exe 0000000144DC36D7 Unknown Unknown Unknown lsdyna_dp.exe 00000001429ED4B8 UNFLANGMAIN 6569 dyn57.F lsdyna_dp.exe 00000001433229AB APPLY_LOADS 10262 fem3d.F lsdyna_dp.exe...
Fix initialization error related to *CONTACT_AUTOMATIC_GENERAL_INTERIOR that resulted in every subsequent *CONTACT_AUTOMATIC_GENERAL also being treated as INTERIOR. Fix for spotwelds improperly deleted due to rigid body conflict when an IPBACK contact interface is in effect. MPP only. Fix to re...
LS-DYNA使用指南第五章2007-11-29作者:**亚太点击进入论坛第五章求解特性5.1求解过程当模型建好后(即,单元、实常数、材料性质的定义,建立模型、网格划分、边界/初始条件指定以及加载、结束控制),执行SOLVE命令即可以开始求解过程。(在GUI中,菜单路径为MainMenu>Solution>Solve)。此时,ANSYS/LS-DYNA程序将运行以下几步...
LS-DYNA R9.0 3-1 (CHEMISTRY) *CHEMISTRY The *CHEMISTRY_CONTROL_1D, *CHEMISTRY_DET_INITIATION, and *CHEM- ISTRY_CONTROL_ZND cards are intended to provide a one-dimensional initialization to a 2D or 3D chemically-reacting flow. In order to perform a full, general purpose chemistry calculation...