You are given an integer array nums of length n, and an integer array queries of length m. Return an array answer of length m where answer[i] is the maximum size of a subsequence that you can take from nums such that the sum of its elements is less than or equal to queries[i]. ...
LONGEST PREFIX MATCH SEARCHES WITH VARIABLE NUMBERS OF PREFIXESKEEN JOHNFRAILONG JEAN-MARCGOEL DEEPAKJAGANNADHAN SRINIVASANADUSUMALLI SRILAKSHMI
Find date with longest total duration sum plus how to display decimal hours as.pbix Message 3 of 3 236 Views 0 Reply DataInsights Super User 08-12-2021 06:49 AM @TomJWhite, Try this solution. It displays the result in hours, but you can format that as ...
OBJECTIVE: In patients with metastatic colorectal cancer (mCRC), several prognostic factors such as performance status (PS), number of metastatic sites, carcinoembryonic antigen (CEA), alkaline phosphatase (ALP) and lactate dehydrogenase (LDH) have been reported. The objective of this study was to...
sum vectorsearch for a vector subsetEuclidean spacepolynomial-time algorithmoptimal solutionWe consider the problem: Given a set of n vectors in the d -dimensional Euclidean space, find a subsetmaximizing the length of the sum vector.We propose an algorithm that finds an optimal solution to this...
sum vectorsearch of a vector subsetapproximation algorithminapproximability boundWe answer the question of existence of polynomial-time constant-factor approximation algorithms for the space of nonfixed dimension. We prove that, in Euclidean space the problem is solvable in polynomial time with accuracy...
Let T be a tree in which every edge is associated with a real number. The sum of a path in T is the sum of the numbers associated with the edges of the path and its length is the number of the edges in it. For two positive integers L_1 < L_2 and two real numbers S_1 ...
The major challenges in drilling Slimhole (6-1/8″ size) ERD well with lateral le include higher torque and failure to deploy lower completion due to high friction factors.The first pilot well was planned with a liner-less design considering the low friction factors required to drill 15,000...
The problem is, given a set of n vectors in a d-dimensional normed space, find a subset with the largest length of the sum vector. We prove that the problem is APX-hard for any p norm, p∈[1,∞). For the general problem, we propose an algorithm with running time O(n^{d-1}(...
The wells were both completed successfully by running the 4-1/2″ lower completion to reach the total depth.Esha Narendra VarmaTheodore Jay DitzlerAli Ben SumaidaPeter Levison MwansaMohammad HusienAbdul Raman Bin BahromRaymond SaragiSPE-Society of Petroleum Engineer...