Load measurementoroverload controlonlifting equipmentoften requires the adaptation of a device which is expensive and difficult to install. To minimise these modifications, theload pinoffers an excellent solution, since it is simply a question of replacing the existing pin with an instrumented pin. O...
6. Lifting reminder function, precise positioning, improve driver's working efficiency; 7. Tilt alarm function, the system will give an alarm prompt when the tower crane is tilted due to loose bolts or diagonal pull. 8. Remote GPRS, GPS positioning function, check ...
3.Non-slip Anti-skid lock steel plate,easy and steady lifting Matters need attentionChain rigging is a rigging with a chain of metal chains divided into single and multiple etc.made of quality alloy steel.Characterized by abrasion resistance, high temperature resistan...
6. Lifting reminder function, precise positioning, improve driver's working efficiency; 7. Tilt alarm function, the system will give an alarm prompt when the tower crane is tilted due to loose bolts or diagonal pull. 8. Remote GPRS, GPS posi...
Technical Loadarm is the leader in lifting device safety inspections. Our team of trained Non Destructive Testing technical staff can conduct forklift inspections on site. We also specialize in Crane inspections at your facility and hoist inspections. As
Load 800kg Electric Glass Vacuum Lifter Robot for Glass Window Installation, Find Details and Price about Glass Lifting Equipment Glass Cleaning Lift Equipment from Load 800kg Electric Glass Vacuum Lifter Robot for Glass Window Installation - Jinan PLK M
6.Parts of the lifting equipment can be sent to you by express within 7 days if needed. Frequently Asked Questions: 1.How can customer buy parts once it break down? The lift adopts most of the common parts of hardware.You can buy the parts in your local hardware market...
By the weight method for measuring of a lifting device and a load carried of a lifter of weighing equipmentAn articulated pipe line comprising rigid sections jointed together so as to allow a limited angular movement between adjacent sections, the axis of two successive articulations having ...
Measuring the load on lifting equipmentThe measuring device is constructed as an oval chain link which upon experiencing load will tend to lengthen so that its long sides move closer to each other; switching devices or other proximity sensing devices respond to this approach to signal, for ...
The ongoing accuracy of such equipment must be checked and verification given to the crane owner for their records. Importantly, JGSIS wasn’t testing the 1,000t capability in this instance, but only verifying that the crane’s instruments were reading the same as the load cell. Additionally,...