Koshi River basinWEAPwater demandhydropowerNepalBiharIndiaThe water resources of the Koshi Basin (87,311km2) are largely untapped, and while proposals for their development exist, their impacts on current and future water demand are not quantified. The current study is the first to evaluate the ...
It was reactivated and intermittently slided during 2000-2012 and finally when the whole mass came down on 2nd August 2014 pushing materials up to the opposite slope, a landslide dammed lake was formed on Sunkoshi river which extended up to a distance of 2.5-3km as observed on 5-6th ...