(jigs / fixtures / tooling) andprocesses. * Develop and deliver production plans, build documentation and route cards for a variety ofengineeringprojects from final design and into series production. * Contribute to the development of the Operations Department strategy. * Co-ordinate cross-functional...
The "keyword"UNBND-VRBLwas a system-defined name that indicated to the system that this was an error of kind "unbound variable". A specific recovery strategy was permitted in this case. One could, either interactively in a breakpoint or through the dynamic establishment of a handler for suc...