【参考译文】所有四架RC-135A(Pacer Swan)飞机在1979年被改装为部分KC-135A配置。这四架飞机(序列号分别为63-8058、63-8059、63-8060和63-8061)获得了独特的KC-135D型号,因为它们与KC-135A不同之处在于配备了飞行工程师的位置。当这些飞机被改装到KC-135标准时,飞行工程师的位置被移除,但它们保留了电动翼...
Termination Finish SnPb TP 100% Matte Sn Preheat/Soak Temperature Minimum (TSmin) Temperature Maximum (TSmax) Time (tS) from TSmin to TSmax 100°C 150°C 60 – 120 seconds 150°C 200°C 60 – 120 seconds Ramp-Up Rate (TL to TP) 3°C/second maximum 3°C/second maximum Liquidous...
Termination Finish SnPb TP 100% Matte Sn Preheat/Soak Temperature Minimum (TSmin) Temperature Maximum (TSmax) Time (tS) from TSmin to TSmax 100°C 150°C 60 – 120 seconds 150°C 200°C 60 – 120 seconds Ramp-Up Rate (TL to TP) 3°C/second maximum 3°C/second maximum Liquidous...
多种输入,PID自动运算,远程设定,自动/手动运行选择,RAMP功能等装有多样功能的新时代*。。MX系列使用起来方便,为了提高可靠性不使用误差调解器(VR),并且装有标准动作,加热/冷却动作,位置比例动作的短外壳(100mm)控制器。解决噪音,灰尘等问题,而且使用设置锁定开关使误差操作问题得到解决。外型尺寸:96*96*100 72*72...
1of 57-1468657ofKC13468atKRIV Habujet Comments 动态日志 需要57-1468 1998年以来的完整历史搜索吗?现在购买,一小时内即可收到。 日期机型始发地目的地出发到达飞行时间 No Recent History Data 注册用户(注册免费而且快捷!)可以查看3 months的历史记录。加入...
H: ramp-down slope from 1°C/s to 4°C/s The curve above is based on solder paste SAC305. For more information about other solder pastes, see the recommended oven temperature curve in the specified solder paste specifications. Technique 2: Wave soldering process (oven temperature curve of ...
摘要: PROBLEM TO BE SOLVED: To improve a method for controlling the ramp-up of transmission power during establishment of a communication channel between a subscriber unit and a base station in a wireless CDMA (Code Division Multiple Access) communication system.收藏...
Termination Finish SnPb TP 100% Matte Sn Preheat/Soak Temperature Minimum (TSmin) Temperature Maximum (TSmax) Time (tS) from TSmin to TSmax 100°C 150°C 60 – 120 seconds 150°C 200°C 60 – 120 seconds Ramp-Up Rate (TL to TP) 3°C/second maximum 3°C/second maximum Liquidous...
Termination Finish SnPb TP 100% Matte Sn Preheat/Soak Temperature Minimum (TSmin) Temperature Maximum (TSmax) Time (tS) from TSmin to TSmax 100°C 150°C 60 – 120 seconds 150°C 200°C 60 – 120 seconds Ramp-Up Rate (TL to TP) 3°C/second maximum 3°C/second maximum Liquidous...
Termination Finish SnPb TP 100% Matte Sn Preheat/Soak Temperature Minimum (TSmin) Temperature Maximum (TSmax) Time (tS) from TSmin to TSmax 100°C 150°C 60 – 120 seconds 150°C 200°C 60 – 120 seconds Ramp-Up Rate (TL to TP) 3°C/second maximum 3°C/second maximum Liquidous...