aDuring pouring of epoxy chocking,all alignment tools(wedges or jacking bolts) must have contact and be in touch with engine foundation. 在倾吐环氧塞期间,所有校正工具(楔子或顶起螺栓)必须有联络和是和引擎基础保持联系。 [translate] 英语翻译 日语翻译 韩语翻译 德语翻译 法语翻译 俄语翻译 阿拉伯语翻译...
The split sleeves 31a and 31b are fixed to the inner wall of the thrust pipe body 10 by means of set bolts 33 screwed thereinto next to the stiffening ribs 32. That process facilitates the alignment of the pressure receiving plates 30a and 30b with the thrust pipe body 10, and also ...
5, wherein U-shaped bolts 51 embrace the cylinder 1 which is formed with teeth 48 adapted to engage teeth 49 on a block 50 seated against the axle 5. Within each cylinder, a piston 2 is attached to a plunger rod 3 terminating in a foot or base 4. Conduits 7, 11 lead from ...