Rebates of up to 60% of the approved project cost are available depending on the system size; USD $1.31/W (0 MW–1 MW capacity), $0.66/W (1 MW–2 MW capacity), $0.33/W (2 MW–3 MW capacity). SGIP is scheduled to run until the end of 2019 and has an annual budget of USD...