Step 1: Installing the Drip Edge The drip edge is hangs 3/4in over the edge. Cut the drip edge to the right size and nail it in place Step 2: Tack on the Tar Paper The tar paper only needs tacked on with a few nails. Step 3: Starting to Put Shingles On When we start to put...
I have about 20' of fall for about 100' of run to the pre-existing septic tank. The tank was installed to accommodate a house. The house is on hold (waiting for more money). The tank and field have been approved for use by the shop. I don't live on site and now it seems ...