A method for installing drop ceiling tiles close to a ceiling is provided and consists of attaching a plurality of grid clip holders to the ceiling, inserting a plurality of T-clips into the grid clip holders, inserting a plurality of main T-members into the T-clips and placing a plurality...
Most of my drops after the ceiling blast gates are about 15 foot runs with a 60 degree elbow, a wye, another 60 degree elbow, another wye, and a 6 ft vertical drop before it hits the next set of blast gates. The line also reduces down from 6″ to 4″ at some point there too....
A method for installing drop ceiling tiles close to a ceiling is provided and consists of attaching a plurality of grid clip holders to the ceiling, inserting a plurality of T-clips into the grid clip holders, inserting a plurality of main T-members into the T-clips and placing a plurality...
A simple device and method for attaching a hanger bracket to a base ceiling is presented which greatly enhances the speed with which a drop ceiling may be installed. A cylindrical main body is surrounded by a rectangular hanger bracket support. The main body and hanger bracket support are ...
A simple device and method for attaching a hanger bracket to a base ceiling is presented which greatly enhances the speed with which a drop ceiling may be installed. A cylindrical main body is surrounded by a rectangular hanger bracket support. The main body and hanger bracket support are ...
The above problems are solved by providing a simple apparatus which greatly enhances the speed with which a drop ceiling may be installed. A cylindrical main body (1) is surrounded by a rectangular hanger bracket support (2). The rectangular hanger bracket support (2) comprises a protruding ...
A simple device and method for attaching a hanger bracket to a base ceiling is presented which greatly enhances the speed with which a drop ceiling may be installed. A cylindrical main body is surrounded by a rectangular hanger bracket support. The main body and hanger bracket support are ...