a早上8点到现场,但施工单位倒运断路器10点30到现场,上午没有安装;下午吊装3相220KV断路器本体,5个机构 Early morning 8 o'clock arrives the scene, but the construction profiteering circuit breaker 10.30 arrives the scene, has not installed in the morning; In the afternoon hoisting 3 220KV circuit ...
Vertically install the WLAN antenna on the platform on the right of the upper frame circuit breaker in the maintenance bypass cabinet (as shown in the following figure), route the WLAN antenna cable through the cable hole, and route the cable along the vertical frame of the cabinet to ...
(3) Bypass input circuit breaker (provided by the customer) The backfeed protection card and fuse terminal block apply to cables with a cross-sectional area of 0.5–1.3 mm2. The actual cable size must meet the requirements of the backfeed protection card, fuse terminal block, and shunt...
Push in the screw hole covers, covering the two exposed screws. When direct wiring and not linking fixtures, make sure to not remove the plastic receptacle cap on each end of the fixture—leave them in place. Turn on the electricity at the circuit breaker or fuse box and verify that the ...
If the installation requires a different power cord than the one supplied with the device, make sure you use a power cord displaying the mark of the safety agency that defines the regulations for power cords in your country. The mark is your assurance that the power cord ...
All insides are DC breaker, SPD etc protection device Packing & Delivery PROJECT CASE Factory off grid system in Jamaica,25KWLocation: Kingston,JamaicaDeveloped: 2018Purpose: Clients factory area often cut off power every day, it has serious problems for their production. Built...
vi Power Systems: Installing the 7316-TF4 18.5-Inch and 7316-TF5 17.3-Inch Flat Panel Rack-Mounted Monitor and Keyboard – For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the power to the system unit(s), or disconnect the customer's DC ...
Step 5Verify that the AC power source circuit breaker servicing each of the AC-input power supplies is switched on. Connecting to a DC Power Source Each DC PDU should be connected to separate DC sources using six threaded terminals. Two terminals for negative (source DC), two terminals for ...
The support wall supports the opposite side of the piston rod(131) of the hydraulic cylinder. The pile-driving unit comprises a hydraulic breaker(210) and an impact transfer member(220).;COPYRIGHT KIPO 2012SON, SEUNG HO
(3) Bypass input circuit breaker (provided by the customer) The backfeed protection card and fuse terminal block apply to cables with a cross-sectional area of 0.5–1.3 mm2. The actual cable size must meet the requirements of the backfeed protection card, fuse terminal block, and shunt...