aIf the NPV is positive, the present value of benefits exceeds the present value of costs. This in turn means that the project will earn a return in excess of the cost of capital. Therefore, the project should be accepted. 如果NPV是正面的,好处的现值超出费用的现值。 这反过来意味着项目将赢...
求翻译:If the NPV is positive, the present value of benefits exceeds the present value of costs. This in turn means that the project will earn a return in excess of the cost of capital. Therefore, the project should be accepted.是什么意思?待解决 悬赏分:1 - 离问题结束还有 If the NPV ...
If the calculated net present value (NPV) is negative, which of the following must be CORRECT. The discount rate used is: A. less than the internal rate of return (IRR). B. equal to the internal rate of return (IRR). C. greater than the internal rate of return (IRR). 相关知识点...
aIf the NPV is positive, the present value of benefits exceeds the present value of costs. This in turn means that the project will earn a return in excess of the cost of capital. Therefore, the project should be accepted. 如果NPV是正面的,好处的现值超出费用的现值。 这反过来意味着项目将...
解析 B When the NPV = 0, this means the discount rate used is equal to the IRR. If a discount rate is used that is higher than the IRR, the NPV will be negative. Conversely, if a discount rate is used that is lower than the IRR, the NPV will be positive. 反馈 收藏 ...
If the calculated net present value (NPV) is negative, which of the following must be TRUE The discount rate used is:()A.equal to the internal rate of return (IRR).B.greater than the internal rate of return (IRR).C.less than the internal rate of return
When the NPV = 0, this means the discount rate used is equal to the IRR. If a discount rate is used that is higher than the IRR, the NPV will be negative. Conversely, if a discount rate is used that is lower than the IRR, the NPV will be positive. 统计:共计86人答过,平均正确...
Coordinates the good construction construction and the off-carriage instrument embedment installment mutual disturbance on own initiative.[translate] aIf a project’s NPV is greater than zero, the project should be ( ). 如果项目的NPV是大于零,项目应该是( )。[translate]...
Answer to: True or False- Relatively speaking, if a project has a positive NPV, that project should be undertaken. By signing up, you'll get...
aIf we are measuring cash flows in dollars, NPV is an absolute dollar amount that represents the expected dollar change in value and therefore the expected dollar change in shareholder’s wealth created by undertaking an investment. 如果我们测量现金流动以美元, NPV是代表在价值上的期望的美元变化并且...