Supplementary requirements for fuse-links for the protection of semiconductors devices C O R R I G E N D U M 1 Page 16 Tableau XIIA - Valeurs pour les essais de vérification du pouvoir de coupure des fusibles pour courant alternatif Explication des symboles Au lieu de: 12a ... Des temp...
小型熔断体要求 1 IEC60127-1 Miniaturefuses-Part1:Definitionsforminiaturefusesandgeneral requirementforminiaturefuse-links 小型熔断器第1部分:小型熔断器定义和小型熔断体通用要求 a)Ratedcurrent额定电流 b)Ratedvoltage额定电压 c)Maker'snameortrademark制造者名字或者商标. d)Asymboldenotingtherelativepre-arcingtime...
1.7.6Fuseidentification(marking,specialfusingClassIIIProduct,NoFuseN/A characteristics,cross-reference): 1.7.7WiringterminalsClassIIIProduct,NowiringN/A terminals. 1.7.7.1Protectiveearthingandbondingterminals:ClassIIIProductN/A 1.7.7.2Terminalsfora.c.mainssupplyconductorsClassIIIProduct,NotN/A ...
250 V ~ (text is print. below fuse symbol) Medical equipment Rocker switch description Function 2-pole, dark not illuminated Marking I - 0 Electrical specifications Inrush current 82 A 6,000 on-off operations according to UL 1054, TV5 10,000 on-off operations according to ENEC Switch ...
Other than under explicit contractual commitments, in no event shall ABB be responsible or liable for any loss or damage resulting from the use of this manual or the application of the equipment. Conformity This product complies with the directive of the Council of the European Communities on ...
thermal fuse. 4.5.7 Specification of any required external protective device, e.g. fuse. 4.6 Pressurization "p" (IEC 60079-2) The following dimensions/details should be shown in the drawings/documents for Ex "p" apparatus where applicable. IECEx OD 017:2024 © IEC 2024 – 21 – 4.6.1...
(fuse) fitted The automatic cut-out shall be reset (or the fuse replaced) before the application of the next 6.4.2.3 After having been subjected to the overloads of short duration and after having cooled to the reference temperature, phase meters, power factor meters and synchroscopes, ...
Part 4-1: Supplementary requirements for fuse-links for the protection of semiconductor devices 鈥?Sections I to III: Examples of types of standardized fuse-links - First Edition; 280 IEC 60761-5-2002 2002-01-01 English, French Equipment for Continuous Monitoring Radioactivity in Gaseous Effluents...
aIsolating fuse link 隔绝保险丝链接[translate] aThe Contractor shall be responsible for selecting suitable aggregates. 承包商将负责对选择适当的聚集体。[translate] ai mean chinese teacher taught you mainly grammar or practice with u by using story and so on? 我意味中国老师通过使用故事教您主要语法...
5016 Fuse To identify fuse boxes or their location. Coupe-circuit; fusible Pour marquer les botes fusibles ou leur emplacement. 5017 Earth; ground To identify an earth (ground) terminal in cases where neither the symbol 5018 nor 5019 is explicitly required. Terre Pour marquer une borne de ...