Ensure that your ladder is positioned at the correct 1-4 angle and that it is either tied or footed adequately before use to prevent slippage.Position your ladder so that your work can be reached without stretching.You may be required to work on pipework at height,when working from an ...
15.2 Pre-Job Safety Meeting 上岗前安全会议 A brief safety meeting should be held to discuss possible alternatives to complete the task, Personnel Hoisting safety procedures, as well as review of the JSA / Pre-Job Checklist and inspection of lifting equipment. 在安全会上,要讨论有无其它 可以替代...
6.4ROADWORK 6.4道路施工 6.5CUTTING/WELDING 6.5切割/焊接 6.6WORKINGINCONFINEDSPACES 6.6在密闭的空间内工作 6.7PROOF/PRESSURETESTING 6.7压力测试 6.8WORKINGATHEIGHTS 6.8高空作业 6.9HANDLINGANDLIFTINGEQUIPMENT 6.9装卸设备和起重设备 6.10VEHICLEMOVEMENT 6.10车辆行驶 6.11ELECTRICAL 6.11电气 6.12OFFSHORE 6.12近海 6.13...
• Working at height safety training • Hot work safety training • Temporary electrical work safety training • Confined space safety training • Lifting operation safety training • Civil work safety training ԈฆHSEీ૰ԍቱ CONTRACTOR HSE COMPETENCE GUARANTEE ဆݴ...
15.3PersonnelLiftingOperations起吊人员操作A.Pre-LiftProcedures:操作前的安全措施1.Determineifanalternativemethodisavailabletocompletethetask.分析有无其它可以替代的方法。2.Visuallyinspectfallprotectionequipment,full-bodypersonnelliftingharnessthatincludesaboardorslingtypeseat,liftingequipmentincludingwirerope,connections,...
Eliminate manual lifting of kerbs at the design stage, (eg use alternative construction methods that do not involve manual handling or eliminate the need for the kerb).Total mechanisation Ensure kerbs are always handled and laid mechanically (eg using vacuum devices/mechanical grabs etc). This is ...
BP公司HSE策略 BPZ2 Execution HSSE Strategy BPZ2 安全策略
5 Smoking 吸烟 2.6 Horseplay 打斗、玩耍与开玩笑 2.7 Proper Lifting Techniques 拿举重物技巧 2.8 Naturally Occurring Radioactive Material (NORM) 遭遇天然放射性物质 2.9 Heat Stress and Heat Related Conditions 受热和与高温环境 SECTION THREE – EQUIPMENT SAFETY 第三部分: 设备安全 3.0 Electrical Equipment...
1.01 Safety shoes/boots with steel toes, hard hats and safety glasses must be worn on the site at all times. 在施工现场任何时候必须穿安全鞋、戴安全帽及安全眼镜。1.02 Face shield, hearing protection, gloves (hand protection), anti-heat clothes, masks, individual breathing respirators system,...