When applying loose insulation, nails or screws can be used as guides placed into the joists at intervals to provide you with some kind of gauge to maintain a more even layer of the material throughout. A Great Ally for Your Attic’s Efficiency Whether or not you’re heating a section of...
Wall insulation is any type of insulating material that is attached to or placed within walls. Normally, the main function of wall insulation is to increase the climate efficiency of the space by making it easier to heat and cool the room. Depending on the type of wall insulation used, ...
Projects and Plans Add Style With This DIY Mid-Century Coffee Table How to Build an Electric Guitar Build This Simple Workbench With Just 6 Cuts Build a DIY Router Sled to Flatten Wood Slabs Build a Simple Planter Why You Should Try Using AI For Your DIY Projects ...
Most commonly used and probably the cheapest insulation material. A loosely spun plastic material reinforced with tiny fibers of glass. Some manufacturers are using between 30% and 70% recycled material. Batts are made to fit between 2×4 or 2×6 studs at 16 or 24 inch centers. R-value re...
6. Remove fasteners such as drywall nails or screws from any exposed joists. 7. Create a frame to support the fan using 2-by-4-inch blocking between the joists around the cut area of the ceiling. This will serve the dual purpose of supporting the weight of the fan and providing support...
In the loft, measure the depth of the existing insulation using a tape measure. Make a note so that you’ll remember the amount once out of the loft. Step 2 Measure the spacing between your joists. To do so, start at the mid point of one joist and measure to the mid point of the...
Here’s what to consider: Cutting the Subfloor: Since the new tub might have a different drain location than the old one, you may need to cut into the subfloor to move the plumbing to the correct location. Be cautious of any floor joists in the way and adjust accordingly. Tip: A ...
The master station will usually fit in the space between wall studs. All wiring can be hidden if you route it through the wall and along some of the underfloor joists. See the next section for an example of the installation of a system with one master and four substations. Although such ...
Now I can set all the joists, and I’ll shoot them on. Those are only there to hold the joist in place. We do not need any joist hangers because joist hangers are merely a way to support the joist if it was being connected to a beam. But since the joist will be resting on top...
For an installation where the ceiling is unfinished with exposed joists, the task just got very simple as pretty much any octagonal ceiling box will do just as long as it is properly attached to the joists. For a finished ceiling, you’ll have to resort to a "cut-in” box, which is ...