How much does it cost to replace floor joists? By most estimates, the average cost ofreplacing floor joistsis around $50 per square foot, including both the materials and the labor. That is, if the floor joists are easily accessible, however, and if nothing else needs to be done. Additio...
Next, you'll want to cut the subfloor out around the perimeter of the room. Set your circular saw to three-fourths inch or five-eighths inch, depending on the thickness of your floor. Cut the perimeter around the edge of the room, making sure not to damage the joists below. Then, ca...
Then, pass the wire through holes in the joists and alongside joists to a hole that leads into the in-wall space to the master station. Since the cables from all the substations run to the master station, you need a larger entry hole through the floor space in the wall below the ...
The first step is screwing these metal tracks all along the ceiling joists. The Easy Up system then uses these metal clips to attach the planks to the tracks – no nailing or drilling. The planks are tongue and groove and snap right together. Then they are held in place by sliding the ...
How was the Floorboard Fitted?The first thing is to work out, is how the floorboard:Is fixed? Where are the floor joists? Do I need to cut the floorboard? If so… Where the best place to cut the floorboard? Are there any pipes or cables underneath the floorboard?
intersect. At the point of intersection, plunge a reciprocating saw through the subfloor. Then, holding the saw at a shallow angle so as to avoid cutting through the joists, cut through the subfloor along each row. When you're finished, work a pry bar underneath the subfloor and pry it...
If your attic has a floor and is used for storage, the potential insulation depth is limited by the depth of the floor joists. Thus, many attics could have a substandard R-factor of only 20 or so -- unless you go to the trouble of removing the floor and adding additional framing lumb...
Next you’ll want to install a piece of metal drip cap flashing above the ledger board. When you install the floor joists you’ll need to make some small cuts in the flashing to allow the top of the joist to line up with the top of the ledger board. Make sure the house wrap is ...
Remove the baseboards and trim around windows and doors on exterior walls, caulk and replace. Make sure all doors seal properly. If your house has an unheated crawlspace, it’s advisable to get into the crawlspace and install insulation in the spaces between the floor joists to keep floors ...
Remove the nails holding the boards in place and replace them with metal angles. Nails often crack the boards. Also, this makes it easier to lay the planks. Install one next to each joist point. Step 5: Cantilever Joists on all Sides ...