When your subfloor is the culprit, there is another way to reinforce joists. Cut a 2 x 8 block, measured to fit snugly between two joists. Be sure to apply adhesive to the top and sides of the block and tap it into place. Drive screws into both ends of the block through the adjoin...
Once you know the positions of the floor joists and have decided on the dimensions of the door, draw the opening outline with a straightedge, framing square, and pencil. Set the cutting depth of acircular sawto the combined thickness of the floor covering and subfloor to avoid cutting into...
depending on the thickness of your floor. Cut the perimeter around the edge of the room, making sure not to damage the joists below. Then, carefully cut the subflooring between joists. Saw between the joists and remove each piece
Another method is to pre-drill pieces of 2 by 2, 18 inches long, at convenient angles for driving 2-inch or 2 1/2-inch screws into the subfloor and joists. Partially drive the screws into the pre-drilled holes. Coat the screws with carpenter’s glue and power-drive them into place....
After the subfloor has been removed, check the joists for water damage and reinforce rotted sections by sistering on lengths of new joist material. Cut two lengths of joist material to fit crossway between the joists and screw them in place so the edges bisect the edges of the cut-out sect...
The floor plan is a great example. The 8 width of a shipping container is roughly a small room. Arrange two containers along their length, remove some corrugation, reinforce, and youve got a medium to large room. Remove all the interior corrugation, reinforce, and you have the equivalent ...
If you have a floor drain in the basement, pipe the water there. If you need to lift the water higher, you dump it into a condensate pump, and have the output go to a nearby plumbing drain. Thermostat wiring: You are down to the really easy stuff now! You can follow the ...
braces and into 2x4 backers on the inside. Though we connected the top plate sections with short 2x6 scabs, we still had some bulging at the top edge during the pour, which we fixed with screw jacks. But in the future, I'll use a continuous second 2x6 plate to reinforce the top ...
2. Reinforce and Level the Subfloor The shower pan must sit on a solid and level surface to prevent cracking. Add extra floor joists or plywood as necessary to remedy any flexing, spread a layer of latex-modified thinset mortar and level it with a trowel. The bubble on your level should...