Dig out the soil and sod where you intend to put the driveway. Dig down at least 8 inches. Check the slope with a level. If possible, slant the driveway toward the street to allow water to run off. If this isn't possible, ensure that there isn't a low spot on the driveway for...
Depressed docks with slope driveways are used where building construction eliminates basements and dock level floors. Caution must be exercised in planning the grade of the driveway. It should not exceed 10% in order that the top of the truck will not hit the wall of the building, cargo top...
However, the cost of installation varies depending on the number of materials needed and the amount of labor involved. Here’s how much pavers will cost to install for projects other than a patio:A paver driveway costs between $10 and $40 per square foot, depending on size, reinforcement,...
When you buy a house, you may find yourself sharing a driveway with a neighbor. As long as both parties are willing to respect each other’s needs, sharing a driveway won't be an inconvenience. However, if your neighbors starts using your side of the driveway for their own vehicles, ...
Location of Rain Gardens First, determine the source of the storm water, such as a rooftop, driveway, or neighboring property. Then use these guidelines to choose a location for the rain garden: Start at the top. It is usually best to create a rain gardenabovewet areas. ...
Since the rain garden itself is level, it is easier to build if it is in an area of the yard with the least slope. Best locations for rain gardens As a general rule, a rain garden should be twice as long as it is wide and perpendicular to the slope of the yard.In addition, the...
Measure the slope of your yard with stakes, string and a level. Fill in the uneven areas with soil, and be sure to keep with your desired slope measurement as you go. By regrading your yard, you’ll help direct the water to your plants that need it most and prevent the water from ...
This is, unfortunately, one of the tougher problems to conquer. Typically requiring some sort of re-hanging, you need to make sure that the gutter has a slope between ¼” and ½” for every 10 feet of material. This will probably require a chalk line to measure correctly. ...
2. Lay Out the Path and Measure the Slope of the Ground Drive stakes to mark out the path of the drain and measure the change in elevation between each pair of stakes. To do this, tie a string to the base of the stake nearest the beginning of the drain, stretch it to the next st...
needed to mark the desired height of your garden edging. The string may not be level since the slope of your lawn might shift, but your entire line should rest at about the same height above the ground. Measure it at a few random places to make sure it does and adjust it as needed....