You can purchase a plastic rain barrel stand or use 2 to 4 concrete cinder blocks (depending on the size of the barrel). Gravel or sand pit: In lieu of a platform, dig a pit 2 to 3 inches deep. Fill the pit with gravel or sand and smooth the top to create a flat, level ...
The railing posts are attached to the anchors either prior to or after the anchors are secured. Surface-mounted anchors are costly but provide a reinforced base for the post and connect in such a way that they meet or exceed Code requirements. They are easier and quicker to install than oth...
Install your laminate flooring one row at a time. Install the first row of planks with the tongue side facing out. Use the tongue-and-groove edges to connect one plank to another. Ensure a snug connection by using a tapping block to gently tap the pieces together. 10. Install Additional ...
Trenches are often dug during construction projects to install utilities such as pipes or cables. These trenches need to be covered securely to prevent accidents and provide access for workers. Additionally, industrial gratings have excellent drainage capabilities, allowing water to flow freely through t...
To battle moist coming from the basement floor consider having asump or a French draininstalled. A sump is basically a hole with a pump in the concrete floor. A French drain, or perimiter drain is a piping drain system that’s an extensive version of the sump. ...
The way they do that is by offering connectivity. This not only increases usability but allows people to tap into the vast internet and mobile network. 4. You need the “sticky” factor Great apps are borderline addictive. And that’s what I mean by being “sticky.” ...
Mix only enough mortar to work ahead so that the cement does not dry out too quickly. Position the coping evenly into the mortar bed. Tap the coping level with a rubber mallet. Check the evenness of the stones with the carpenter's level. Use a standard 1-1/4 inch overhang. Fill in ...
Since we’re installing over a concrete slab, each hole needs to be pre-drilled, and the track needs to be fastened with concrete anchors. Joe used 1-1/4″ Tapcons. This picture shows two of the three strips Joe installed, and you can visualize how the heat cable will run back and ...
Think of how absurd it is to wake up this way. Before your mind can take in the immediate reality of your life this morning—your bedroom, your house, your neighborhood, and the other concrete details life is actually made of—you are already asking it to process the implications of diffe...
You will also need lumber to build a frame to hold the pipes in place while the concrete cures. This helpful guide from IronRidge explains how it works. The ground mount section of this solar panel installation guide also contains more information on building a substructure.Roof Mounting — Buy...