When lift the tower top, should install two transition plate at the direction of jib boom, install long pull rod and short pull road; at the direction of balance arm, place the top two pull rods on the top of tower top. Then assemble the platform, handrail and ladder and start to lift...
Install grounding rods. You should use at least three 6 feet long grounding rods; install them near the charger and about ten feet apart from each other. The grounding rods should be at least 4 feet in the ground, but the rule of thumb is to leave only two inches above the ground. Us...
Make sure cables run horizontally, or downwards to the ground. Aluminum systems are cheaper than copper. Also, there are physical limitations to using copper. For example, don't use copper with aluminum-sided houses. If you have any qualms about your ability to install lightning rods on your ...
7. Insert Ground Rods Next, you’ll need to insert grounding rods. This is how the electricity will work. If you don’t use enough grounding rods you’ll know it because your fence will not carry current. So we actually placed two around the base of the post where our charger is loca...
Now you simply need to slide the clips onto the curtain rod and attach the curtain to the clips. An important thing to remember is to measure the point where the curtain rod will be drilled to the ground. This way you are able to buy the proper length shower curtain and will not have...
Next, navigate to File > Examples > grbl > grblUpload. A new sketch will open and we need to upload it to the Arduino board. The code might look weird as it’s just one lines, but not worries, everything happens in the background in the library. So, we just have to select the ...
If you are using apole mount, you will also need to install an eight-foot copper ground rod at the pole location. If you live in a very dry or desert-like environment or have very sandy and rocky soil, you may need to install two or three ground rods and connect them to...
Hayward makes it easy because they sell skimmer kits that have just about everything you need to install or replace an old above-ground pool skimmer. Cut out the large skimmer opening. Using your cutting tool, cut the skimmer opening as traced. Make sure to cut through the pool ...
Step 2 Dig holes in the ground where you want to install the privacy screen, spaced 24 inches apart. Ensure the depth of the holes measures one-third the height of the support posts, so they are securely anchored in the ground. Collect the dirt in mounds placed near the holes. ...
This is a good time to clean out the area of any dirt and debris. Check the tray for cracks and replace if needed, before setting the new battery into place. Attach the battery hold-down. The shorter of the two hook rods attaches in the rear. Remember to re-clip the ground wire to...