To convert kW to KVA you say kW/Power factor=KVA. The kVA is a measure of the apparent power while the kW gives the actual power running through the...Become a member and unlock all Study Answers Start today. Try it now Create an account Ask a question Our experts can answer your...
Your question is not clear and appears to be incomplete as well. I think, u wish to know "How to find out the exact capacity of a transformer". Thus if the nameplate is 50 kVA then "How can I find out if the transformer confirms to this capacity". Please correct me if I am wron...
How to Install 13.8kv 50kVA 100 kVA Single Phase Pad Mount Underground Transformer 120/240V share: Contact Now Chat with Supplier Get Latest Price About this Item Details Company Profile Price Min. OrderReference FOB Price 1 unitUS$850.00-3,500.00 / unit ...
Check whether or not you really need to convert. For example, if you started with a bhp figure from an auto magazine and you want mechanical horsepower, you don’t need to convert. If you do need to convert, find one of the many Internet sites that will convert between the two differen...
The electrical distribution system of a typical industrial facility, such as a water treatment plants, is shown in Figure 2. The task is to evaluate the size of the new ventilated self-cooled transformer (or evaluate the size for the existing), based on its required loads, using the two me...
The figure below shows the three-phase connection sequence (A-B-C). The neutral connection is optional. The polarity influences the DC load connection. Figure 19. STDES-VRECTFD connection Step 2. Connect an external fan to manage...
to ensure the transformer does not overload. Within power distribution it is common to find the total connected load exceeds the supply KVA, but it assumes not all the load is connected at one time. Obviously you need to ensure the distribution transformer has adequate O/L and O/C ...
The figure demonstrates a small inverter design using IC 4093 Schmidt trigger NAND gates. Quite identically here too the N4 could have been avoided and the BJT bases could have been directly connected across the inputs and the outputs N3. But again, N4 is included to accommodate the one extra...
Even aluminum foil if you can figure how to connect to it. Likes mheslep Aug 7, 2016 #39 SanPhysics 31 1 Thanks for reply Aug 7, 2016 #40 SanPhysics 31 1 SanPhysics said: Thanks for reply Hardy sir can you suggest any method to test output current of transformer so I...
The test circuit for the surge test is shown in figure 4.3.1. The insulation resis- tance after the surge test shall not be less than 2 Mohm at 500 V dc. The insulation resistance is tested with a 500 Vdc and should be a minimum of 2 Mohm for basic insu- lation and 4 Mohm for...