Attach the Fittings:Connect the 90-degree and 45-degree fittings, slightly offset as discussed. This small adjustment helps direct the dust downwards. Attach this assembly to the pipes installed in the bottom bucket, with the 45-degree fitting resting against the bucket’s side. Secure the Fitti...
You can connect this one with another by dragging the end of the pipeline to the other instrument. After setting the connection between the two pieces of equipment, the endpoint turns green. When the pipelines and instruments are connected, add valves to your P&ID diagram by selecting them ...
When Glenn Miller strolls through his hometown of Akron, Ohio, he looks for ordinary things to turn into extraordinary lamps. Whether HVAC ductwork, a skateboard, a whiskey barrel or an old kerosene lantern, he converts his finds into unique lighting fixtures that serve as bold conversation ...
Cut two 2x4 wood to connect to the studs in the gable. These pieces of wood should run horizontally from one stud to the other and should be positioned just above and below the opening. Screw the wooden pieces to the studs. Caulk around the flanges of the fan and insert it into the...
Connect the coils. At one end of the chiller, connect the ends of the inner and outer coils using short pieces of plastic tubing and pipe clamps. You'll need to connect the ends of the coils on the other side of the chiller to a small submersible pump using longer pieces of plastic...