centers, which made it tricky to locate solid blocking behind the drywall to mount the cabinets. Your cabinets might also need modification. For example, if you plan to route a HVAC register or range hood throug
If you need help with more than one bathroom, you may want to plan them as one project. At the same time you create a sumptuous private bath for you and your spouse, you may be able to add a roomy, guest bathroom down the hall. If you love your property and your neighborhood, remo...
blocking the pipe entirely. While there are home tools like a plunger or plastic drain snake that can work to break up a clog, they are only temporary fixes. Eventually the problem will resurface and homeowners find themselves attempting to clear out their drains once again, using the same ho...
Wall-mounted acoustical tiles, wall panels, fabrics and vinyl barriers are designed to be applied to the surface of a wall and are relatively easy to install. There are also sound dampening products like blown-in fiberglassinsulation, vinyl and lead barriers for installation behind drywall, often ...
If you would like additional soundproofing power, a common installation method is to roll MLV onto the existing drywall and sandwich it with a second layer of drywall. This can add a tremendous amount of weight, however, so be sure to check with a structural engineer or qualified construction...
You should also apply a moisture repelling oil-based wood stain to your wooden fence. This will help prevent rot by blocking the absorption of moisture that can cause rot and discoloration. You can choose from a variety of stain colors, depending on your preferences. However, you should choose...
Mounting it directly to the wall behind the bed Attaching it to the bed frame with bolts or screws Freestanding between the wall and bed if it's heavy enough to be stable on its own How do I choose the right size for my DIY headboard?
if it’s a hollow metal frame it needs to be packed with mineral wool, installed, and then caulked at the drywall returns. Real deal pedigreed soundproof doors are going to be in the STC 50 and STC 55 range, meaning they stop 50 dB and 55 dB respectively. These are expensive…in the...
Since we are now covering that block wall with drywall after all is done, do we NEED insulation or water barrier behind it? It IS a bathroom, after all.I was thinking of either not using insulation and applying a water barrier to the surface of the drywall OR using foam board between ...
The rough-in plumbing phase occurs when the building’s framing is complete but before drywall is hung. This is when the basic plumbing lines are laid without making any final connections. The plumber will connect the water and sewer line to the main plumbing stack, which is typically located...