The insulating-material layer (8) is fastened to the ground beam (5) by a clamping connection. By this design, a thermal separation of the outer floor from the inner floor covering is achieved. SEURING,GERHARD
Therefore, a cooperative (and not a conflicting) dynamic is created between self-interest and collective interest: although often economic, financial, and social actions are based on utilitarian values, the complex system created by the spheres’ connection should always be understood as having a ...
backgroundsignal-extraneoussignalsthatcanbeconfusedwiththephenomenonto beobservedormeasured;"theygotabadconnectionandcouldhardlyhearoneanotheroverthebackgroundsignals" background interference,noise,disturbance-electricaloracousticactivitythatcandisturbcommunication ...
The resistance of the test component ground connections may then be measured in order to determine the quality of the ground connections formed by the fabrication process. The quality of the ground connection fabrication process may then be determined based on the measured resistance of the test ...
In Chapter 1 we introduced terminals as the VHDL-AMS feature for representing the physical connection points or circuit nodes of a system. Recall that terminals are declared to be of various natures, which represent different energy domains of a system. We also introduced branch quantities as the...
To achieve gigabit data rates while mitigating strong background noise photons and beam drift in a highly attenuated free-space channel, a comprehensive design of a multi-functional detector is indispensable. In this study, we present an innovative compact multi-pixel superconducting nanowire single-...
phased antenna beamforming, automatic alignment, automatic connection, and multipoint access. Security mmWave spectrum interference-free, full-process encryption, and EN50155 rail transit environment certification. Products RTN560A train-to-ground data dumping requirements such as vehicle-mounted video and...
Adding Support Axisymmetric Analysis
Lötschberg Base tunnel (Switzerland) [91] In a zone of highly squeezing rock with a great height of overburden, it was necessary to install HiDCon beam elements over a tunnel length of 180 m. rb; ssrb + shd (HiDCon); ovx Strenger tunnel (Western Austria) [92] The parallelism of ...
thus shortening the connection time between the processes and providing more space for the subsequent process of invert construction, reducing the distance between the tunnel face and the invert, and closing the initial support to a complete ring with a short distance from the working face as soon...