Domestic offshore gas project in Australia moves ahead Published9 January 2025 1:07 GMT Exclusive Two large FPSOs moving centre stage for Australian LNG project Published9 January 2025 1:04 GMT Field Development Shell advancing Australian project to backfill gas to the Prelude FLNG facility ...
项目管理(Project Management):探讨了石油和天然气项目中的项目管理,包括项目相关因素、组织相关因素对项目性能的影响,以及如何实现项目性能的期望维度,如及时完成、成本、质量、安全和财务表现。 ISO标准(ISO Standards):介绍了ISO 9001质量管理体系、ISO/TS 29001石油和天然气行业特定质量管理体系、ISO 21500项目管理系统...
[36]. The presence of water among contaminants is highly corrosive, and that is why a dehydration process is mandatory; it will also help to evade the formation of hydrates in the gas processing and, last but not least, to avoid water vapor to condensate and causes pipe plugging [37]. ...
This is dictated by the “MinFlow” equation called out in the previous “Sizing and Selection” section of this document. If the buildup is causing a zero drift, cleaning and re-zeroing the meter should bring performance back to its original performance specification. If coating of the ...
Figure 2 illustrates the flow and heat transfer characteristics of the leakage port of the string, and the string can be divided into three parts: the gas in the injection–production pipe string, the injection–production pipe string, and the annulus fluid between the pipe string and casing. ...
Solomon O, Adewale D, Anyanwu C (2017) Fracture width prediction and loss prevention material sizing in depleted formations using artificial intelligence. In: Paper presented at the SPE Nigeria annual international conference and exhibition, Lagos, Nigeria. https://doi.org/10.2118/189068-MS Somasunda...
Due to the bonding of solid particles, there is a serious problem of gas-solid flow pipe and conduit blockage in a large number of processing industries. In response to this problem, the paper uses specialized simulation tools (ANSYS R16.0 FLUENT) to study the effects of gravity on the flow...
Figure 2. Flow chart of research idea and approach. SAS and GP sand control completions are the mainstream sand control completion methods, and horizontal and vertical wells are mainly used in the current marine hydrate production tests in the world. Therefore, this paper conducts indoor physical...
The flow chart of the established unequal length crack interference method is shown in Figure 1. Step 1: Establish the unequal-length crack model of the X80 oil and gas pipeline weld, and set the geometric dimensions, material parameters, load parameters, and other information of the pipeline ...
If a particular spool has five joints of 6" diameter, the total DI for the pipe welds is 30 DI (6" × 5 joints = 30 DI). PCU (Case 2): The function of the Propylene Compressor Unit (PCU) is to compress the propylene gas to transform it into a liquid state to minimize the ...