Installation and Use Regulations 1998 This work describes a rapid and objective method of determining repositioning error during the course of precision radiation therapy using off-line CT imag... JL Robar,BG Clark,JW Schella,... - 《Journal of Applied Clinical Medical Physics》 被引量: 0发表...
These include mobile and stationary pressure control stations and main pressure regulators as well as spring-loaded and dome pressure regulators for line installation. Pressure regulators or pressure reducers reduce the gas pressure of a gas source to the working pressure required for the application. ...
was to modify the compressor on Well 1 (it was a single-stage recip, but it was designed to allow converting it to a 2-stage in a couple of hours site work) to get high enough pressure to supply an ejector that could pull on Well 2 and exhaust into the preexisting line pressure. ...
This leaflet aimed at landlords explains some of the main requirements of the Gas and Safety (Installation and Use) Regulations 1998 (see CIS 00-924), name... S Executive 被引量: 1发表: 2002年 Domestic energy consumption: temporal unregulated electrical energy consumption in kitchens in Scottish...
KA-30 laser in-line gas analyzer can be widely used in the offsetting project (CO2, O2, NOx, NH3, etc.), electrolytic aluminum factory (HF, HCl, NH3, etc.), coal-fired power plant (escape ammonia), steel metallurgy (converter gas , CO and O2, etc., blast furnace gas, coal syste...
Once the pipeline diameter is decided, the quantities of gas that can be delivered is fixed by the pressures, although an increase in the maximum quantity can be achieved by adding compressors along the line, extra pipe in the form of loops, and/or by increasing the average pipeline pressure...
(1)Installation requirements of ethylene oxide sterilizer: 1)The ethylene oxide sterilizer must be placed in a well-ventilated place, and it must not be placed near a fire source. 2)In order to facilitate repair and regular maintenance, 51cm space should be reserved on each si...
Sub-Line System Product Name FM200/CO2 Gas Extinguishing Control Panel Main Power Supply 90 to 270VAC, 50Hz Backup Battery 2 PCS Lead Acid Battery Power Supply Rating 3A@24VDC Initiating Device Circuits 4 Detection Zones Notification Appliance Circuits ...
Lineare increase until 2050 for meadows and agriculture. c Sink potential of the forest and wetlands will be assumed constant. Sign in to download full-size image Fig. 51.Reduction over time in direct CO2emissions by additionally using natural sinks in the LACE region. ...
When the sales gas reaches a local gas utility, it normally passes through a gate station to serve three purposes: (1) reducing the pressure in the line from transmission levels to distribution levels, (2) adding an odorant so that consumers can smell even small quantities of gas, and (3...