The metal gas pipe is intended for connection to a consumer installation, particularly a gas meter or an inside stop valve. It comprises a flexible, corrugated-wall pipe (1) provided with a fixed electrically insulating element (4) positioned so as to prevent electrical currents from passing ...
As a result, not only the number of residential households and commercial/industrial ("C/I") users of our gas projects will increase rapidly, but also the Group's natural gas sales volume. It is expected that the proportion of connection fees to the Group's turnover will continue to ...
Using bolts and washers with a strength class of 8.8, the busbars of the switchgear are maintenance-free during the entire operation, provided that the bolted connection has a suitable tightening force during the installation of the equipment, ...
Since the intra-regional pipeline connection is largely non-existent in East Asia, it is the LNG spot cargo trading that is likely to become the basis for the regional gas futures market. This paper offers a novel approach to understanding the development of such a market by analyzing the ...
[200] using SMA, by which consistent and easy torque is achieved. Such type of selftorqueing fastener do not require additional attention from workers and can still provide consistent torques on connections. Two type of connectors in underwater connection are hydraulic and electrical connectors, ...
Thus, unless specified, “connected” is intended to embrace any operationally functional connection. As used herein “substantially,”“generally,” and other words of degree are relative modifiers intended to indicate permissible variation from the characteristic so modified. It is not intended to ...
characterized by a relatively higher bond length, representing the connection between the adsorbent and the adsorbate. Specifically, noteworthy results include the S110—C79 bond interaction in the P_Ni@GP_PEDOT@H2S system, which displayed the longest bond at 4.7285 Å. Conversely, the shortest bon...
• If additional information is required, contact the Service Department at the 800 number shown on the front of this manual. 26 TROUBLESHOOTING GUIDE POLARIS ELECTRONIC CONTROL BOARD UTEC Status Indicator LED Error Conditions: Flashing 1 Time - Control is in lock-out because the inducer pressure...
Since gas imports come from Germany and are transported to Liechtenstein through the Testbed network, we assume that the connection from the Testbed to Germany is the only pipeline at transmission level. The remaining pipelines are then part of the high and medium pressure level and therefore at ...
First, set the voltage of the bench supply using a precise digital multimeter to precisely 4.2 V/cell multiplied by the number of cells (or whatever the appropriate charge voltage is for your specific cell, 4.1 V, etc.). After you have set the appropriate charge voltage, next short-circuit...