1) gantry crane operator 高架起重机操作员2) operate a crane 操作起重机3) gantry crane 高架起重机 例句>> 4) overhead crane frame 高架起重机架5) craneman's house 起重机操作室6) overhead crane 高架起重机;桥式起重机补充资料:门座起重机 可转动的起重装置(简称转动部分)装在门形座架上...
gantry-crane-operator网络龙门起重机操作员;高架起重机操作员;高架移动起重机操作员网络释义 1. 龙门起重机操作员 NOC-7371 起重机操作员... ... 龙门起重机操作员 gantry crane operator 牵引车起重机操作员 tractor crane operator ... blog.sina.com.cn|基于5个网页 2. 高架起重机操作员 政府部门常用...
A gantry crane has first and second side support frames spaced by a pair of trolley beams. A load lifting mechanism is connected to the trolley beams and includes a lift frame for engaging a load to be lifted. An operator cab is mounted on the first side support frame and is vertically ...
United States Patent US5810183 Note: If you have problems viewing the PDF, please make sure you have the latest version of Adobe Acrobat. Back to full textHome Search Services Contact us © 2004-2024 FreePatentsOnline.com. All rights reserved. Privacy Policy & Terms of Use....
The operator cabin moving mechanism for a gantry crane adopts a bidirectional winding principle of a wire rope hoisting mechanism, and can achieve the purpose of moving the operator cabin forward and backward. The smoothness of the starting and the braking of a motor can be reduced simultaneously...
Gantry crane with elevating operator cabFeider, ThomasLenius, NorbertLazzeroni, EdwardDir, Ronald
SIMULATING MOTION OF AN OPERATOR CONTROLLED GANTRY CRANE IN A CLUTTERED WORK ENVIRONMENTDavid FrakesKaren E GrosserJoel FortgangWe Singhose
1. Dynamics, control, and design of biomechanical system ; Innovative laboratory experiments in education ; Instrumentation, measurement, and sensors ...: 2000 ASME(American Society ofFrakes D,Grosser Karen,Fortgang J,Singhose W.Simulating motion of an operator controlled gantry crane in a ...
crane controlsupport vector machineSVMgeneralised gaussian distributionIn this paper, a robust non-linear control scheme is proposed for a gantry crane system with estimation of swing angle by using operator-based robust right coprime factorisation approach. By analysing properties of the crane system, ...
A gantry crane has first and second side support frames spaced by a pair of trolley beams. A lifting mechanism is connected to the trolley beams and includes a lift frame for engaging a load to be lifted. An operator cab is mounted on the first side support frame and is vertically ...