steel construction(1) for Industry 4.0(1) chemical(1) construction project(1) for shop(1) telecommunications(1) power distribution(1) TCP(1) for structural design(1) substation(1) surface model(1) hydraulic(1) pneumatic(1) manufacturing process engineering(1) ...
aout-of-sequence operation 正在翻译,请等待...[translate] ausing the industry accepted logging technique, 使用工业公认的采伐的技术,[translate] a1. Prepare the steel base as described on the Foundation drawing. 1. 准备钢基地如所描述在基础图。[translate]...
3. Design of the Digital System 3.1. Architecture This digital system adopts C/S (client/server) architecture, including the client based on.NET framework and the server based on SQL Server external database. Additionally, the system combines ADO.NET technology, ActiveX technology, and automation...
acentimeters.And the thick of concrete protect layer for steel bar is 5cm,except where special notedin drawings.[translate] a1、The drawings are the structure and steel bar drawing for ball valve and servomotor's foundation,[translate]
ASMTower performs foundation design for telecom structures for both Mat and Monopile foundations, following American and European standards.
The base slab of the foundation should be designed to handle extra forces caused by uneven load distribution. The weight of concrete both above and below ground level, along with any embedded steel, should be considered to add to the down-thrust. ...
PROBLEM TO BE SOLVED: To reduce the residual amount of a lubricant after wire drawing without lowering wire drawability by forming the film of zinc phosphate on the surface of a steel wire before wire drawing and using slaked lime in its upper layer as a rust preventive.青山 敦司...
The invention relates to a steel frame canopy guard structure of a single-layer purlin masonry house and a construction method thereof. The original roof i... 董有,鞠树森,谢建明,... - CN 被引量: 1发表: 2013年 Sill & Floor Construction Vocabulary Architectural Drawing & Design II Unit 3:...
Test drawing of the anchor pile method. Full size image In the self-balancing method, a test pile was divided into two parts: the upper pile and the lower pile. The upper and lower piles were connected by a load box. After the pile sunk, an upwards force was applied to the upper pil...
pulled out of the receiving means by the carrier structure which is drivable in rotation, and are applied, as a result of the rotational movement of the carrier structure, in a ring form around same. Throughout the entire time the form of the ring-form steel wires is stabilized by the ...