Here the footing and wall pour is complete, with concrete that has a 30% fly ash blend with local aggregate. The next step will be to roll on the waterproof air barrier, an emulsion made specifically for “green” (ie.not-yet-cured) concrete. We were able to apply the waterproo...
mutually opposed forms and a termite-preventive continuous footing 1 is executed at that time, a termite-preventive panel 3 is used as at least one of the mutually opposed forms and concrete is placed and solidified, and the termite- preventive panel 3 is unified with the continuous footing.KO...