METHOD OF MAKING CONCRETE TO FILL HOLE OF CONCRETE WALL OR LIKEUTSUYAMA AKIRA
CellFill's mobility and high production rate make cellular concrete an ideal material for many applications such as abandoned water and sewer pipes, corrugated metal pipe backfill, mine shaft, and large hole capping, erosion control, bridge backfill behind abutments, and more!
The filling aggregate consists mostly of the processing tailings, as well as crushed waste rock, wind sand in desert areas, river sand, waste concrete, and red mud. In addition, admixtures are added to improve the fluidity of the slurry and the mechanical strength of the solidified paste, ...
To that end, a steeply inclined 'surveying borehole' was drilled in the concrete at a conservative offset, sub-parallel to the interface and extending to a slant depth of 50 m. Borehole seismic methods were applied after borehole radar proved unable to achieve sufficient range of investigation...
The action of filling an excavated trench or hole, while planting for example. Dictionary of Unfamiliar Words by Diagram Group Copyright © 2008 by Diagram Visual Information Limited Want to thank TFD for its existence?Tell a friend about us, add a link to this page, or visitthe webmaster'...
In construction and excavation work,to fill something with additional dirt.When building foundation walls or retaining walls,one excavates a space large enough to build the walls and provide a comfortable work space,and then backfills with additional rock and dirt afterward. ...
9.APPLICATION OF BOREHOLE CAST-IN-SITU PLASTIC CONCRETE PILE IN CONSTRUCTION OF WATERPROOF CURTAIN IN SEASIDE ARTIFICIAL ROCK-FILLED LAYER塑性混凝土冲孔灌注咬合桩在海滨人工填石层施工止水帷幕的应用 10.Public Filling Sub-committee [Fill Management Committee]公众填土小组委员会〔填料管理委员会〕 11.Local ...
In order to meet the related engineering quantity computing rules of shotcrete and lining concrete in TZJ 2003-2017 Budget Quota of Railway Project( Chapter 3: Tunnel Engineering),the unified calculation rules of backfill quantity and cost of tunnel overbreak is studied. Based on the general refer...
Occurrence of an extraordinary flood caused large flows through the uncompleted rockfill section of Hell Hole Dam on the Rubicon River, California. The par... Johnson, Horace A. - 《Journal of the Soil Mechanics & Foundations Division》 被引量: 16发表: 1971年 Reservoir Routing using Steady and...
The main loads are on the perimeter from concrete panels. Maximum 50 kN/m on edges. 5. How expensive would it be to remove the uncontrolled fill? Could it then be reused as controlled engineered fill? Extremely expensive probably 200-300K. 6. Can the controlled fill be left in place for...