14.1 The Contract Price 合同价格14.2 Advance payment 预付款14.3 Application for Interim Payments 期中付款的申请14.4 Schedule of Payments 付款价格表14.5 Plant and Materials intended for the Works 拟用于工程的生产设备和材料14.6 Interim Payments 期中付款14.7 Timing of Payments 付款的时间安排14.8 Delayed Pa...
9.9 Payment for Plant and Materials in Event of Suspension 在暂停施工情形下对设备和材料的支付 9.10 Prolonged Suspension 暂停施工的延长 9.11 Resumption of Work 复工 9.12 Completion of Design-Build 设计-建造的完工 9.13 Failure to Complete 未能完工 10 OPERATION SERVICE 运营 10.1 General Requirements 一...
一、红皮书 红皮书适用于传统的土建、房屋和基础设施项目,设计和施工是分离的的,也就是常说的DBB(Design Bid Build)。施工方按照甲方提供的设计图纸进行施工建设。二、黄皮书 黄皮书适用于生产设备相对多的房建及工业项目,适用于我们常说的DB(Design and Build)模式,比如供水、污水处理、厂房、工业综合体等等。
FIDIC黄皮书指Conditions of Contract for Plant and Design-Build《生产设备和设计一施工合同条件》。Conditions of Contract for Plant and Design-Build are recommended for the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under the ...
2.2《生产设备和设计-施工合同条件》Conditions of Contract for Plant and Design-Build:推荐用于电气和(或)机械设备供货和建筑工程的设计与施工。这种合同的通常情况是由承包商按照雇主的要求,设计和提供生产设备和(或)其他工程;可以包括土木、机械、电气和(或)构筑物的任何组成。
【摘要】fidic于2008年9月在加拿大魁北克省举行的2008年会期间推出被国际工程界冠之为“金皮书”的DBO合同(ConditionsofContractforDesign,BuildandOperateProjects(FirstEdition,2008),DBO模式立即成为国际工程界关注热点。设计-建造-运行是一种国际通行并十分成熟的项目建设模式,不仅在工程市场领域运用,而且在许多其他领域...
1、FIDIC- 建造合同条件CONDITIONS OF CONTRACT FORPlant and Design-Build通用条件 专用条件编制指南 争端裁决协议书格式 投标函、合同协议书格式周可荣 刘雯 万彩芸 王健译刖百FIDIC (国际咨询工程师联合会)是国际上咨询工程师最权威的组织,FIDIC编制的合同 文件在国际上为世行、 亚行、非行及许多国家的项目中采用,...
本文简称 FIDIC)在伦敦举办的国际用户会议上,发布了1999版三本合同条件的第二版,分别是:施工合同条件(Conditions of Contract for Construction)、生产设备和设计-建造合同条件(Conditions of Contract for Plant and Design - Build)和设计-采...
黄皮书指Conditions of Contract for Plant and Design-Build《生产设备和设计一施工合同条件》。 Conditions of Contract for Plant and Design-Build are recommended for the provision of electrical and/or mechanical plant, and for the design and execution of building or engineering works. Under the usual ...