Recommended Lessons and Courses for You Related Lessons Related Courses Variable Ratio | Reinforcement Schedule & Examples Instant vs. Delayed Gratification | Overview & Differences Delayed Gratification | Definition & Examples Neutral Stimulus | Definition & Examples ...
estimate of the 95% quantile of the posterior distribution of Co∼Vθ Es elastic modulus of steel reinforcement F̂ measured value of the output variable F in a model F⌣(·) deterministic part of a model FLR,II(·) LoA II load-rotation function (accounting for model uncertainty variab...
A salaried paycheck is an example of a {Blank} reinforcement schedule, whereas piece-rate pay is an example of a {Blank} reinforcement schedule. A. continuous; fixed interval B. fixed interval; fixed ratio C. variable ratio; variable interval D...
The ratio of the patch size to the length of input example motion at the coarsest stage controls the receptive field for synthesis, similar to the concept in image domain. A larger K causes a smaller receptive field, leading to more diverse results. In particular, a large K allows only ca...
Blending ratio estimation loss LA. To take full advantage of the blending information provided in the forgery syn- thesizing process, we further construct a task to estimate the blending ratio output by the synthesizer network. Be- cause the blend...
That is, low levels of bus riding occurredunder conditions of nonreinforcement, intermediate levels emerged under both continuous and variable ratio 36 schedules, and higher levels of bus riding emerged during a variable ratio 6 schedule of reinforcement....
Use strength class C32/40 with water-cement ratio 0.5 and minimum cement content of 340kg/m3 for exposure condition XD2.Nominal cover to reinforcement = 60mm (45mm minimum cover plus a tolerance Δc of 15mm).Reinforcement to BS 4449:2005 Grade B500B: fy = 500N/mm2...
A dual-index evaluation of energy consumption and comfort is proposed for the first time. This paper found that respondents placed about a 6:4 important ratio on “comfort” and “energy efficiency” in their dwellings and that the importance placed on comfort increased from low-energy to high...
The main theatre’s balcony needs reinforcement. Repairs and upgrades to the concession area are also necessary. Painting will put the finishing touches on the interior of the structure. Finally, the interior should be fully restored by mid-March, once the upholstery repairs are finished. By ...