EATON 产品参考手册说明书 ECN0521AAA-R63/D ECN0501AAA-R63/B ECN0511AAA-R63/C ECN0501AAA-R63/C
service entrance down to the single-phase loads.Standards and certifications • UL 1449 5th Edition recognized component for the United States and Canada,covered by Underwriters Laboratories certification and follow-up service Features • Uses thermally protected metal oxide varistor (MOV)technology ...
Eaton SP2涌动保护设备安装和运行指南说明书
2. Installation Figure 1 illustrates the Front Switching Mechanism with the arc barrier removed, exposing the automatic switching mechanism. This mechanism is held in place by 4 bolts that attach, through the breaker, to the back panel. This mechanism must be removed in order to replace the Aux...
• Service entrance—UL 1008 Listed and 100% rated • Overcurrent protection with Power Xpert Release (PXR) thermal-magnetic or electronic trip unit • NEMA T 1, 12, 3R, 4X enclosure or open frame design • Automatic transfer controller: ATC-900, ATC-300+, ATC-100 Codes and ...
Eaton EPCT火灾泵控制器产品介绍(BR124015EN)说明书 Eaton EPCT Fire T ouchscreen based electric fi re pump controllers 15
Eaton Pow-R-Line Xpert瞬时开关板产品概述说明书 Low-voltage power distribution and control systems > Switchboards > Pow-R-Line Xpert instant switchboard Contents General Description . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 .8-2 Product Overview . . . ...
When it is desired to use the panelboard as service entrance equipment, it is necessary to provide a main disconnect switch for the panelboard. To achieve this, a double pole circuit breaker is mounted in the first two pole spaces provided by the insulators 28 below the lug main insulator ...
• Suitable for service entrance equipment applications with field installable ground bar, kit number DPFG. Metallic Fused Disconnect Metallic Non-Fused Disconnect Metallic Non-Fused Disconnect with Weather Resistant- Tamper Resistant GFCI Receptacle. ...
"OFF" position. If the transfer switch is a Service Entrance (SE) rated device; turn the service disconnect switches to the "DISCONNECT" position.Figure 2. Breaker in the "OFF" Position.Step 2:Verify that 0 Vac is available at the "N1" and "N2" termi-nals. Also verify that 0 Vac...