Head Drop test - The dummy head certification test requires a free drop of the head assembly onto a rigid surface from a height of 376 mm, such that the initial contact with the rigid plate occurs at the forehead. The peak resultant head acceleration has to be within the defined ...
The entire assembly is wrapped in Fiberglas to limit and smooth the thermal loss rate. T1 T2 bF L U I D - - - - FLOW I I 1\ I I ttt I HEAT Figure 11. Flowmeter principle With no flow through the pipe , the power is dissipated into th e medium in a symmetrical manner. Under...
Basic IFU assembly Radio Interface Module 155M optical S-1.1 interface unit Coax Cable CNT-400 between IFU/IDU a IFU mounting kit incl 19 ODU 13GHz 266MHz sub-band 2 Low ODU 13GHz 266MHz sub-band 2 High ODU HSB/2+0 Coupler 17.7-19.7 GHz ODU 18GHz sub-band 2 Low ODU 18GHz sub-...
A load distribution bracket is required to transmit the impact energy into the slider assembly, as seen in Figure 1. NOTE: The Ensolite® pad is closed cell foam that can be damaged by impact and age. The pad should be regularly inspected and replaced if there are signs of damage and/...