ensuring it retained a rawness without discolouring and ensuring thermal breaks were introduced as required. This was meticulously set-out to suit the square grid of the tiles and cast in a single pour to give a consistent finish throughout. The oak window and doors...
b. Coat hook mounted at 60”/1.5m above the finished floor on the back of partition doors. 隔断门门后离地 1.5m 高度应安装挂衣钩。 c. Sanitary napkin disposal trash bin (in women’s restroom). 卫生巾抛弃垃圾桶(女卫生间内)。 2. The following items are required within the shared ...