On-time delivery rate 100.0% Response time ≤2h Total annual revenue $1500000 Floorspace 3000m² R&D engineers 3 Services Minor customization Full customization Quality control Finished product inspection On-site material inspection Order with confidence Verified as Custom Manufacturer ...
Pressure:High;Place of Origin:CN;SHG;Material:Steel;Use:Other;Model Number:Other;Brand Name:Other;Certification:TPED/CE/DOT/TC/ISO;Water Capacity:50L for oxygen cylinder;Working Pressure:150bar;Test Pressure:250bar;Outside Diameter:232mm;Application:oxyg
Certification:ISO9001; Application:Industrial Lubricant; Part Number:1630083300 1630054200 1830023405 1830023406; Condition:New; MOQ:1 PCS; Video Outgoing-Inspection:Provided; Machinery Test Report:Provided; Marketing Type:Ordinary Product; Keyword:Air Compressor Accessories; ...
Ideally, a new Annual MVR should be completed the same day as the Annual Review. Managers must sign and date the Annual Review document on the same day. The Annual Review should list all of the violations (regardless of vehicle type or ownership) a driver had in the past year that are ...
2) All products have gone through strict inspection procedures, according to the batch of blasting test, as well as water pressure and air tightness test, to ensure that the products meet the quality requirements before leaving the factory. For ...
The products has successively passed IS09001/IS09002 international quality systemcertification, American DOT certification, Nigeria SONCAP certification, and has first-class quality inspection centers, scientific research institutions and informationcente...
Model NO. 175/75R14 185/55R14 195/60R14 Type Tubeless Diameter 15-16" Tire Design Radial Tyre Tyres Width 165-195mm Certification ECE, DOT, ISO, CCC, CE, RoHS, GS, FCC Tread Pattern Highway Tread Pattern Inner T...
2) All products have gone through strict inspection procedures, according to the batch of blasting test, as well as water pressure and air tightness test, to ensure that the products meet the quality requirements before leaving the factory. For e...
We'll test the mould again after polishing,then send customer the final sample and video of mould test to confirm.Through the accurate analysis of mold design, processing steps and plastic mold structure, we provide a perfect solution for cu...
Annual temperature 5 0 0 Lightning overvoltage 15 10 0 Operation overvoltage 5 15 0 Hot-line work 15 10 0 2 tower design with documents provided 1 Line details - Circuit (SC) & KV. DC, 220 KV 2 Number of phases. 3 3 Tower details Wind span 400m Weight Span...