Bidder shall be responsible for engineering, selection and connection of all components and sub-systems to form a complete system whose performance is in accordance with f 分布式的数字控制监视和信息系统DDCMIS的 (要求) 在这个规格被表明根据功能依据。 投标者负责工程学、所有组分的选择和形成表现是与...
A partial or full loss of functionality 23 or a deviation from desired state or behavior is called failure or error. 24 Field: In this specification, a field (lower case) is an informal notion referring to some scalar data element that 25 is stored or accessed in management memory. It ...
38 Common management specification Rev 3.0 When used in the DataPathActivated State, the Apply_DataPathInit control copies the Staged Control Set into the Active Control Set and performs a full re-initialization of the data path. In this scenario, the Apply action must be performed on all lanes...