Connecting the Antenna -TROLL Link 101Only 1.Screw the antenna and gasket onto the antenna connector,located on the top of the enclosure mounting bracket.Connecting and Deploying Instruments Ensure data-logging capable instruments have been programmed with a data log before completing the following ...
4. On the Linkage Group tab page, set Link smoke alarm with clasp lock open to on. 5. Modify the AI/DI_1 signal name. 6. Enable the AI/DI device. Linking the Fire Control with Cabinet Electronic Clasp Lock Open 1. Log in to the ECC800-Pro WebUI as an administrator. ...
fire control with Cabinet Electronic Link smoke alarm with Cabinet Clasp lock open to on. Electronic Clasp lock open to on. 5. Modify the AI/DI_2 signal name. 5. Modify the AI/DI_1 signal name. 6. Enable the AI/DI device. 6. Enable the AI/DI device. ...
Reduction of collateral damage to device connector pins and harness connectors (multimeter punctures leading to intermittent failures in the future) Tool stays connected at ONE SINGLE LOCATION reducing frustration, confusion, and time to identify connector pinouts from the service wiring diagram In depth...
Interval: <lw_status_interval> (uplink frames); see Default Parameter Values Application Layer / Sensor Status Massage Payload: Bresser/BLE Sensor Battery Status (Bitmap) Port: CMD_GET_SENSORS_STAT Interval: <app_status_interval> (uplink frames); see Default Parameter Values See Parameters for...
There is also a RJ-11 connector for the telephone interface. The module includes both data compression and data correction functions. The maximum data rate is up to 57.6 Kbits/second. The line input is protected by a telecom PTC fuse, sidactors, and a heavy-duty 350 V discharge tube. ...
For example, if you create three 10 GbE uplinks from each gateway switch, then the client network traffic from the servers is handled by the switches as shown in the following table: Server Number Active Link Backup Link 1 GW1 Switch 1 Link 1 GW Switch 2 Link 1 2 GW Switch 1 Link ...
•TheWi-FiortheshorterantennawithafemaleSMAconnector shouldbepositionedontherightsideofDAU. 28Preparingforinstallation Configureinternetconnection TheDAUprovidesoptionsfor3Gor4GSIM-basedinternetconnectivity(LTE/GPRS) andEthernet(LAN)basedinternetconnectivity.Seesection,ConnectingLAN ...
Micro SD Connector Circuit Diagram CYW943907AEVAL1F Evaluation Kit User Guide, Document Number: 002-18703 Rev. *D 38 Hardware 4.7 JTAG Connector 4.7.1 On-board Programmer/Debugger and Serial Interface Chip The on-board programmer/debugger chip uses JTAG to program/debug CYW43907 based SiP ...
4. On the Linkage Group tab page, set Link smoke alarm with clasp lock open to on. 5. Modify the AI/DI_1 signal name. 6. Enable the AI/DI device. Linking the Fire Control with Cabinet Electronic Clasp Lock Open 1. Log in to the ECC800-Pro WebUI as an administrator. ...