Crawler crane with the same left and right crawler assembly each otherPROBLEM TO BE SOLVED: To provide a crawler crane having the same right and left crawler assemblies interchangeable with each other.マーティン レイクス
Crawler crane roller assembly The rollers play a role in supporting the gravity of the machine. It rolls on the track link joints or track guide plates to prevent the track from sliding laterally and derailing. Key words: Classification:
Cranes|Material: Environment friendly:Crafted from eco-friendly materials, this crane model ensures a safe and sustainable play experience. Instruction: PDF mail delivery:Comprehensive instructions delivered via email for easy assembly, no physical manual needed. Replacement parts: Free missing part service...
Crane e.g. crawler crane of crane system used during assembly of wind power plant, has connecting element is provided between rotating platform and undercarriage, for generating bias voltageThe crane (20) has a rotating platform (4) with an excavator boom (5) and a prolonged intersect (10) ...
The unit has a height-adjustable roller (200a). An independent claim is also included for a crawler crane with tilting edges.doi:EP2353976 A1WILLIM HANS-DIETER DIPL.-ING.EP
Crane e.g. crawler crane of crane system used during assembly of wind power plant, has connecting element is provided between rotating platform and undercarriage, for generating bias voltageThe crane (20) has a rotating platform (4) with an excavator boom (5) and a prolonged intersect (10) ...
Lattice boom for crawler crane, has lattice element whose longitudinal axis is oriented with working assembly, and width is greater than working assembly, so that transport of lattice element is less than maximum permissible massThe lattice boom has a case which is provided with several lattice ...
The crawler-type crane driving mechanism comprises the driving wheel assembly provided by the invention. According to the invention, the driving wheel and the crawler plate can be prevented from the tooth meshing when being used in a matched manner, so that the maintenance of the driving wheel ...
In the analyzed case, the assembly of large-size elements in the form of a welding process was carried out outside. Therefore, there was a problem with the corrosion resistance of the elements produced in this way. In this article, special attention is paid to ...
The steel pipe frame is used for temporary support in site hoisting, and the tower crane is used to hoist the segmental components, so as to reduce the cost and speed up the construction progress. The construction simulation and calculation of the arch value for each sub section...