The procedure for the execution of the movements of the lifting elements (1, 2, 3, 6, 7) is such that the elements are moved alternately or simultaneously, such that the crane finds the optimum position for executing the required lift. The device for carrying out the movements is designed...
Procedure for placing a load and for picking up the placed load or for stacking loads with a lifting crane 来自 掌桥科研 喜欢 0 阅读量: 16 申请(专利)号: FI20100006285 申请日期: 2010-12-03 公开/公告号: FI20106285A 公开/公告日期: 2012-06-04 申请(专利权)人: KONECRANES OYJ 发明人:...
TTS克令吊操作手册crane operation instruction rev2
9 Installation Balance Adjustment To facilitate the adjustment procedure, we recommend locking the three axes before the adjustment and unlock and adjust them one by one. • Loosen the quick release plate thumb screw and make the camera grip as close to the tilt axis motor as possible. • ...
PERFORMANCE TOOL® warrants the product to be free from defects in materials and workmanship under normal use and service. A defective product may be returned for a free replacement within 90 days from the date of purchase, provided that product is returned to place of purchase immediately after...
Maximum Lifting Weight <20t Main Girder Form Single Girder Type Ordinary Product Name 10t Single Girder Bridge Traveling Hanging Crane Working Class A4 Painting Color Customized Power Supply AC-3phase-220~440V-50/60Hz Hoisting Mechanism Hoist ...
Single Girder Beam Casting Foundry Crane Safe Metallurgical Plant Lifting for lifting molten metal and foundary location is ameliorated and designed on the basis of LD type single girder overhead crane. It uses CD/MD model electric hoist as the lifting mechanism ...
Tower cranes are widely used for lifting operations in the construction industry. Statistics show that tower cranes contribute to quite a number of serious accidents. Property damage and bodily injuries can be avoided if they are properly used. Tower cr
Lastly, there are the categories “environment and mechanical influences” 25 and the category “lifting” 26. It should be pointed out that the mentioned enumeration is not definitive, but instead can be expanded or restructured as much as desired. Using the navigation area 30, the crane ...
To bring the pipe laying crane from working (FIG. 2) to transit position (FIG. 1) the afore-described procedure is to be reversed. Thus, the pipe laying crane of the invention has greater load-lifting capacity when in working position than the known cranes of the same weight, whereas whe...