DCMA’s 14 Point Assessment has received a lot of attention over the past few years, to the point that it is now recognized as the leading diagnostic test for integrated master schedules (IMS) within several government agencies. However, the assessment is by nature a “lagging indicator” in ...
摘要:项目交付模式的选择是工程项目管理的关键性问题之一,交付模式的类型随着经济社会和项目特点的变化而不断丰富和多样化。从20世纪90年代后期开始,国外率先提出新型的项目交付模式——集成项目交付(Integrated Project Delivery,IPD)模式。IPD模式使用的合同体系分为三种基本类型:多方独立型的IPD模式,多方合同型的IPD模式...
Author keywords: New Engineering Contract Version 3 (NEC3); Engineering and Construction Contract (ECC); Integrated projectdelivery (IPD); Relational contracting; Hong Kong. 论文下载
a new data item description (DiD) entitled the Integrated Program Management Report, or “IPMR.” Meant for cost reimbursable contracts with an earned value management system (EVMS) requirement, it combines the previous contract performance reporting (CPR) requirements with Integrated Master Schedule...
Integrated Cost-Schedule Risk Analysis Using the Risk Driver Method Many cost estimates assume that the project schedule is engraved in stone. Estimates of project cost may be unbiased but still, they do not represent the best estimate of total cost until project schedule risk is considered. This...