NBN Co, the company rolling out the national broadband network, announced in the last week of November that it would be stopping the connection of those who are allotted HFC from December 11.Sam VargheseExchange
NBN CO COST PER PREMISE SHOWS LITTLE MOVEMENT OVER YEARThe cost for setting up a full-fibre connection in a brownfields site was $4403 in June 2017 –rnand just two dollars lower, at $4401, by June 2018.rnIn the case of full-fibre greenfields connections, the cost per premises was $...
as a specific manifestation of suburban morphology, belongs to the urban phenomena that is very often studied but still remains ambivalent. The ambivalence of the assessment results from the problems of weighing costs and benefits generated by sprawl. At the same time, there is a gap in internati...
[it] would be absurd not to do that. But I wouldn't be personally hung up on getting a commercial return on every last dollar spent because I think that's just bad economics. What's the best use we can make of the NBN should drive it provided they've got enough money to...
Figure 3. 14-bus microgrid connecting mid-rise apartments (all of the bus connection cable lengths are in meters) [27]. Appl. Sci. 2018, 8, 884 7 of 16 (b) Proposed two-objective Pareto-based Optimization The Pareto-based dynamic evolutionary algorithm attempts to optimize the Pareto ...
These concern the inspection and maintenance regimes of the grouted connection (GC) in both the offshore substation and wind turbines. Maintenance of the equipment installed on the offshore assets is to be carried out with consideration of the original equipment manufacturer's recommendations and ...
Since a Quantum MX410 also allows the connection of acceleration sensors, the authors also carried out measurements using two uniaxial accelerometers, type Bruel & Kjaer 4507B. The accelerometers were installed on the beam at location A1 and on the flange at location A2, as shown in Figure 3....
weather protection is typically added to the top of building in connection with the construction of wooden apartment buildings. When the costs of a sprinkler system and weather protection are taken into account, the cost of achieving positive climate effects through a concrete frame is 290% higher...
Also, weather protection is typically added to the top of building in connection with the construction of wooden apartment buildings. When the costs of a sprinkler system and weather protection are taken into account, the cost of achieving positive climate effects through a concrete frame is 290%...
infrastructures Article A 5D Building Information Model (BIM) for Potential Cost-Benefit Housing: A Case of Kingdom of Saudi Arabia (KSA) Ibrahim Alrashed 1 and Komali Kantamaneni 2,* 1 MOMRA (The Saudi Arabia Ministry of Municipalities and Rural Affairs), Riyadh 13531-3337, Saudi Arabia; ...